![](http://notredameinnovationspace.co.uk/wp-content/uploads/slider/cache/ad11e817d270340c6fb1e0f45f22490a/Notre-Dame-Innovation-Space-Slider_01.jpg)
![](http://notredameinnovationspace.co.uk/wp-content/uploads/slider/cache/ee4431cea2a4c78d15bba9b29657f546/Notre-Dame-Innovation-Space-Slider_02.jpg)
Slide 1
A bold new space to explore all aspects of Technological Innovation
Slide 2
A state-of-the-art teaching space allowing students to use the latest technology
We are delighted to announce that we have been given the go-ahead to build our new ND INNOVATION SPACE.
The new multi-million pound, two-storey building will be a state-of-the-art contemporary teaching space that will offer our staff and students, across all subjects and all disciplines, the chance to use the latest technology as part of their day-to-day learning.![Notre-Dame-Innovation-Space-Home](https://notredameinnovationspace.co.uk/wp-content/uploads/Notre-Dame-Innovation-Space-Home.jpg)
A bold new space for Technological Innovation
Latest News
- The external facade cladding and windows are progressing well which in about 1 month will allow the outside access scaffold to be removed. Internally all the mechanical and electrical installations are complete to allow internal...
- This week we are continuing with the cladding on the outside walls. In addition to this, we are also connecting plumbing and electrical services as well as partitioning, boarding and insulating walls on the inside...
- We are storming ahead now on our innovation space! The roof is now finished and walls have been knocked through on both sides into Science and the 2-storey building. Work has also started on the...
- This week, with the steel framework firmly in place, we have been able to add the floor and the roof to the building. Progress is certainly able to be seen now!...
- The steel framework has been painted, arrived on site and been bolted in situ....
- The groundwork and slabs are all completed. Steel framework will arrive next week ready to install....
The building, situated in a landscaped courtyard with space for socialising at break and lunchtimes, will be fully accessible and connected on both sides to the existing science labs and the main school classrooms.